| 项目资料 |
| 项目名称: |
兴国年产2000吨碳化钨、500吨硬质合金生产线 |
| 所有制结构: |
港、澳、台经济 |
| 项目类型: |
新项目 |
| 拟合作方式: |
独资 和 合资 和 合作 和 其它 |
| 项目所属地区: |
华东地区 --->江西 --->赣州市 |
| 项目所属行业: |
制造业 |
|
| 年份: |
前三年 |
前二年 |
前一年 |
| 年销售收入:(万美元) |
|
|
|
| 税后利润:(万美元) |
|
|
|
|
| 项目主要内容:(包括项目背景、项目规模、主要产品、项目前期进展情况、项目所属行业的市场容量、市场预测及投资回报分析、风险分析等) |
| Construction Items: The production of 500 tons of Hard alloy and 2000 tons of tungsten carbide powder every year. Favorable Factors: The project locates in Industrial Zone of XingGuo. It is an important part of center area of XingGuo city. The transportation network of Economic and Technical Development Zone extend in all directions, linking inside and outside, convenient and completed function. No. 319 national highway and Jing-Jiu railway etc goes through the whole county. It can easy connect to the whole transportation system. Good position and convenient transportation network which supply a good transportation conditions the construction of the project. Project Investment: The estimated total investment is RMB 11.758 million. Market Forecast: In the recent 10 years, the GDP of China will increase at speeds of 8%; therefore, the need of tungsten will increase at this condition. And the country proposed the policies of the limited exploit of tungsten, so, the need of tungsten products will stay in master position in long term. Benefit Forecast: The annual sales income will reach RMB 63.600 million, and profit will reach RMB 4.969million. |
| 项目单位基本情况:(经营范围、主要产品、企业股东或主管单位等) |
|
| 项目管理团队及专业经验:(姓名、学历、职务、专业经验等) |
|
|
| 项目方可供资料: |
项目简介 |
预计项目建设所需时间: |
|
投资回收期: |
|
|
| 资金需求计划 |
| 项目总投资(以万美元计): |
1680 |
| 投资方首期投入(万美元): |
0.00 |
需分几期投资: |
0.00 |
|
| 项目方投入(万美元): |
|
投资方投入(万美元): |
|
其他资金来源(万美元): |
|
|
| 项目方投资及构成(万美元) 总额: |
|
| 其中 |
资金
|
土地
|
建筑
|
设备
|
贷款
|
其他
|
|
| 投资方投资及构成(万美元) 总额: |
|
| 其中 |
资金
|
土地
|
建筑
|
设备
|
贷款
|
其他
|
|
| (预计股权结构): |
项目方股份: |
投资方股份: |
其他: |
|